Road Collapse Prevention and Maintenance of Old Sewage Pipelines

English
BUSINESS
Ongoing Projects
Pipeline Maintenance

Road Collapse Prevention and Maintenance of Old Sewage Pipelines

Classification Sewer line
Location Seoul
Construction period 2016.06~2019.02

The project is the second part of the road collapse prevention and maintenance of old sewer pipes carried out by Seoul Metropolitan City, involving non-excavation sewer pipe maintenance and reinforcement work for a sewer pipe with a diameter of 600mm and a length of 14m over two years. The Hi-Performance Tube method was used to minimize traffic control and noise while shortening the construction period.