The project is the second part of the road collapse prevention and maintenance of old sewer pipes carried out by Seoul Metropolitan City, involving non-excavation sewer pipe maintenance and reinforcement work for a sewer pipe with a diameter of 600mm and a length of 14m over two years. The Hi-Performance Tube method was used to minimize traffic control and noise while shortening the construction period.