Installation and Removal of Temporary Bridge during the Reconstruction of Seongju Bridge

English
BUSINESS
Ongoing Projects
Temporary Bridges

Installation and Removal of Temporary Bridge during the Reconstruction of Seongju Bridge

Classification Temporary Bridge in Steel Structure
Location Gyeongsangbuk-do
Construction period 2016.08~2019.06

The Seongju Bridge, which was built in 1975 and 1955 respectively, has been undergoing reconstruction since 2016 due to deterioration. As part of this, a temporary bridge was installed for the reconstruction of the main bridge, which was planned to be used until 2019 and then removed. The temporary bridge was constructed using the G.T.B method and is a large-scale structure that reaches a width of 10 meters, a length of 470 meters, and uses 3,796 tons worth of materials.